Unsealed road which is eroding due to poor drainage and rutting out.Reconstruct existing unsealed road, incorporatig new roadbase material to add to existing suitable material. Place new bitumen seal consisting of one layer of 10mm stone and 2 layers of 7mm stone.
Blocked drainage and road impassable during wet season, rendering the residents unable to get in or out of the property. The road being the only access to the Airport and council officesCollapsed Inlet and Damaged head and end walls, Erosion and removal of rock protection upstream of road crossing, Separation, Displacement, Structural Failure of Pipe, Pavement Deformation, Sinkhole and Loss of Base course and Seal Deformation
Replaced headwall or end wall including allowance for removal of existing and construction of new apron. Cast in-situ end structures to culverts. Replaced damaged pipe including excavation, bedding, backfill, and supply of new pipes; Reconstructed roads- Trim existing road. Reconstructed using sub base quarry supplied, sub base and Type 2.1 unbound granular base. Excl seal. Resurfaced-Spray Seal-Place a new 7-14mm double seal surface treatment. 5 m wide sealed road 2 cost set.
gravel loss, wheel ruttingresheet gravel road for length of 4.0 km and width of 6 metres
Asphalt surface - ravelling and potholingCrack seal. Profile along kerb line. Resheet with 30mm SMA Asphalt.
Asphalt surface - ravelling and potholingTraffic control, raise gullies, profile tie ins, seal with 30mm AC7 asphalt.
Asphalt surface - ravelling and potholingRepair failed sections. Replace kerb and footpath north side. Replace 87mt kerb south side. Some profiling required. Resealing 30mm SMA Asphalt.
Asphalt surface - ravelling and potholingTraffic control. Reshape table drain. Repair fail sections and reseal with sprayed seal.
Asphalt surface - ravelling and potholingRaise gullies. Profile tie ins. Seal with 30mm AC7 asphalt.
Asphalt surface - ravelling and potholing - 240m X 7.4mTraffic control. Raise gullies. Profile tie ins. Seal with 30mm AC7 asphalt.
Inconsistant surface due to widening, median works and drainage installation.Resurfacing, part kerb replacement and path tie ins.Total cost of proposed project is $228,000