The surface is cracked and potholed.The road will be resealed using 10mm aggregate and the head of the cul-de-sac will be overlayed with a 25mm thick asphalt layer.
There is limited gravel on this section of road in critical areasGravel resheeting of critical areas
The existing surface is cracked and potholed.The road will be resealed with 10mm aggregate and the cul-de-sac will be overlayed with a 25mm thick asphalt layer.
Major congestion occurs during PM peak hours. Extra southbound lane through roundabout will assist traffic hour.Adding extra southbound lane North and South of roundabout.Total cost of proposed project is $572,566
The existing surface is stripped, cracked and potholed.10mm aggregate reseal
Eva Lynch Way has a long straight length of road (500m) with no traffic calming devices resulting in excessive speeds.Traffic calming devices.Total cost of proposed project is $166,955
Rand Avenue is a long straight road with no traffic calming measures resulting in excessive speeds through the intersection which results in increasing vehicular and pedestrian conflicts.Installation Of RoundaboutTotal cost of proposed project is $199,066
Existing pavement and seal is worn out and has extensive cracking and deformation.Final sealTotal cost of proposed project is $65,581
Traffic Volumes in this location have reached a point where this road now requires extra lanes.Turning single carriageway road into dual carriageway road (4 lanes).Total cost of proposed project is $1,123,056