Deteriorations of sealed road surface, loss of stone, cracking and oxidation to a condition where intervention is requiredRepair road surface in preparation for resealing between chainages 00 and 670m
Deteriorations of sealed road surface, loss of stone, cracking and oxidation to a condition where intervention is requiredRepair road surface in preparation for resealing between chainages 00 and 1700m
Significant surface cracking present and isoloated wheel rutting, depressions and polishing of existing surface. Further delapidation may lead to pavement base course being compromised, and shortening of its useful life.remove existing asphalt wearing course by road profiling to just beyond crack depth, lay a thin layer of dense grade asphalt as a corrector course, and then resurface with between 25-30 asphalt. Some isolated kerb repairs and adjustments to drainage lids are expected.
loss of graveladd 100 mm gravel for width of 6 metres, compact
High traffic speeds identified in the vicinity of primary school and school crossing. Installation of flat top road humps including at the school crossing will significantly reduce traffic speeds in the school as identified in a recent local area traffic management study.Installation of flat top road humps
A local roads intersection with a history of crashes. Existing bus stop in the close proximity generates a number of pedestrian movements without any safe crossing facility. The construction of a roundabout with pedestrian refuge islands will significantly improve the safe operation of the intersection and will provide safe pedestrian crossing facilities.Construction of a roundabout
A local roads intersection with a history of crashes. The construction of a roundabout with pedestrian refuge islands will significantly improve the safe operation of the intersection and will provide safe pedestrian crossing facilities. Additionally will reduce traffic speeds along Glencairn Drive as identified in a recent local area traffic management study.Construction of a roundabout
The existing roundabout at the intersection is operating poorly. The upgrade of the existing roundabout will significantly improve the safe operation of the intersection including safer pedestrian crossing and cycling facilities.Upgrade of the roundabout
The existing roundabout at the intersection is operating poorly with no pedestrian or cycling facilities. The upgrade of the existing roundabout including pedestrian refuge islands and cycling facilities will significantly improve the safe operation of the intersection and will provide safe pedestrian crossing and cycling facilities. Additionally will reduce traffic speeds along Reservoir Road as identified in a recent local area traffic management study.Upgrade of the roundabout
Existing uncontrolled cross road intersection with a history of crashes and high traffic speeds. The construction of a raised intersection traffic treatment will significantly reduce the likelihood of crashes and traffic speeds on O'Shanassy Street and improved cycling facilities as identified in a recent local area traffic management study.Construction of raised intersection pavement