620 meters of sealed road pavement reaching end of life leading to failures.Rehabilitate shoulders and mat out crossings and pot holes. Reseal with 10mm aggregate
Sealed pavement reaching end of useful life which is leading to pavement failure.Rehabilitate edge break, crossovers and ptholes. Reseal with 10mm aggregate
Sealed pavement reaching end of useful life causing failure to occur.Rehabilitation of shoulder break, potholes and crossovers. Reseal 10mm aggregate.
Road pavement and kerb & channel associated has deteriorated and requires partial reconstructionPartial reconstruction of the road pavement, kerb & channel and the provision of a new asphalt overlay
Road beginning to fail in various sections, Road surface is old and rough and needs resurfacing.Rehabilitation of sections along the road that are failing. The works are to be undertaken as part of a more general upgrade that will include complete resurfacing of the road, verge kerb and pram ramp replacing were required.
Road beginning to fail in various sections. Road surface is old and rough and needs resurfacing.Rehabilitation of select number of sections along the road that are currently failing. The work is to be undertaken as part of a more general upgrade that will include a complete resurfacing of the road, verge kerb and pram ramp upgrade.
Surface deterioration due to stripping, loss of stones and bleeding.Polymer modified binder reseal
Pavement defects such as, rutting, bitumen cracking, potholes and narrow section of roadPavement rehabilitation, road widening and bitumen resealing
Road is narrow, inadequate drainage, failed pavementReconstruct and widen the road pavement, upgrade the stormwater drainage utilizing infiltration drainage techniques.Total cost of proposed project is $1,611,442
End of life of sealed pavement is causing fratique and failure.Rehabilitation of shoulders,potholes,crossovers. Reseal 10mm aggregate.