The road surface has commenced cracking and the old seal has oxidised due to age. The road surface requires resealing to continue protecting the road pavement.The proposed works will reseal 0.89 km of Pringles Way west of Lawrence-Tullymorgan Road.
Road surface deterioration by oxidation or minor ravelling but structurally soundAsphalt thin overlay and bitumen rejuvenation (spray seal) to address functional problems and achieve the best value for money outcome in accordance with Pavement Management System (PMS) full asset life cycle modelling. Cost based on approx 5458m2 at $10.21/m2Total cost of proposed project is $49,941
Road surface deterioration by oxidation or minor ravelling but structurally soundAsphalt thin overlay and bitumen rejuvenation (spray seal) to address functional problems and achieve the best value for money outcome in accordance with Pavement Management System (PMS) full asset life cycle modelling. Cost based on approx 1452m2 at $10.21/m2Total cost of proposed project is $16,466
The road surface has commenced cracking and the old seal has oxidised due to age. The road surface requires resealing to continue protecting the road pavement.The proposed works will reseal 0.34 km of Cypress Street.
The road surface has commenced cracking and the old seal has oxidised due to age. The road surface requires resealing to continue protecting the road pavement.The proposed works will reseal 0.745 km of Diamond Street.
The road surface has commenced cracking and the old seal has oxidised due to age. The road surface requires resealing to continue protecting the road pavement.The proposed works will reseal 0.29 km of Jubilee Street.
The existing causeway across Yanda Creek becomes impassable in wet weather. The saturation of the material forming the causeway extends the period of closure.Gravel re-sheet, form and stabilise approximately 250 metres of causeway and then seal the new formation.
The road surface has commenced cracking and the old seal has oxidised due to age. The road surface requires resealing to continue protecting the road pavement.The proposed works will reseal 0.35 km of The Peninsula.
The road surface has commenced cracking and the old seal has oxidised due to age. The road surface requires resealing to continue protecting the road pavement.The proposed works will reseal 0.29 km of Mariners Way.
The road surface has commenced cracking and the old seal has oxidised due to age. The road surface requires resealing to continue protecting the road pavement.The proposed works will reseal 0.78 km of The Mainbrace.