Degraded road seal surface with severe cracking and aggregate loss in seal.Sealing of 410 m length, 4.0 m width road surface
Safety of motorists and pedestrians interacting throughout the work location.Installation of traffic calming devices.
Unsealed road contributing to poor driving conditions and excess dust.Overlaying 100mm of gravel and compaction and a 2 coat seal finish.
Bend at section is too sharpRealign section to improve road safety
Insufficient pavement width, unsealed service and poor associated drainage of the road causing roughness leading to traffic safety issuesOverlay existing 3 metre pavement with 100mm of gravel and widen to 6 metres and seal to 4 metres and associated drainage improvements
Poor drainage as result of deteriorated condition of the pipes and causewayReplace new pipes and reforming the section
Bitumen surface is aged and severely cracked. That is the bitumen surface is failing, risking further failure to the road pavement.Repair surface failures and apply asphalt overlay to intersection.
Bitumen surface is aged and severely cracked. That is the bitumen surface is failing, risking further failure to the road pavement.Repair surface failures and apply asphalt overlay.
Multiple failures of pavement along Higgins Street.Deep pavement patching with asphalt surfacing.
Deteriorated pavement and seal causing rough ride and significant maintenance costsOverlay with gravel and stabilise to strengthen pavement