Speed of vehicles and crashes at Wellington St intersection.Construct a roundabout at Wellington St intersection and reduce width of roadway by defining parking embayments on roadwayTotal cost of proposed project is $534,194
Existing kerb and gutter lifted by tress roots causing stormwater to enter pavementStage 1 works to remove a portion of kerb/gutter and tree and replace with new kerb works.Total cost of proposed project is $30,000
Pavement failure due to heavy vehicle trafficStaged removal of pavement and replace with a more durable concrete pavement.Total cost of proposed project is $18,000
Loss of pavement shape and materials.Reform and replace gravel loss with secondary crushed material.
Loss of pavement shape and material.Reform and replace gravel loss with secondary crushed material.
Realignment of the road to remove dangerous section (Black Spot) over the :Jump-Up".Realignment of the Eastmere Road over the "Jump-Up".Total cost of proposed project is $611,600
Loss of pavement shape and material.Reform and replace gravel loss with secondary crushed material.
Second coat seal to existing bitumen seal.Reseal the existing pavement with a polymer modified binder.
The existing road has no gravel resulting in blow outs of the natural surface.Prepare sub-grade, import gravel, spread, water, shape and compact to design cross falls.
Existing bitumen seal shows signs of fatigue and deterioration.Undertake preparatory works to repair pavement as necessary and seal the existing (repaired) pavement with a polymer modified binder.