Existing pavement has worn and needs replacement crushed rockResheeting with crushed rock (Length 4290 Width 5m Depth 100mm)
Existing road surface is failing with potholes, surface deformations and service trench failures.Overlay road surface with emulsion micro-surfacing to restore surface shape and condition.Total cost of proposed project is $122,984
The road has a damaged existing seal with road base and sub-base deterioration facilitating minor drainage repairs.Initially accomplish minor drainage repairs as needed followed by required base and sub-base layer stabilisation where required. Bitumen re-sealing is completed to protect the road base and improve road surface.
The road has a poor base and has very little material on the road to grade. The road has drainage issues and requires clearing to improve sight lines.Gravel resheet the 2 km section including widening various sections, drainage improvements and maintenance and shoulder maintenance
The existing road base is very poor and very little material is on the road to grade.Gravel re sheet the 4.00 kilometer section including widening various sections,drainage maintence and shoulder maintenance.
The existing road has a very poor road base and has very little gravel on the road to grade.Gravel re sheet the 4 kilometer section, including drainage improvements and maintenance, shoulder maintenance and signage improvements.
The shoulders on Cox Drive have eroded resulting in a drop off from the bitumen.Reinstate shoulders by reforming them with new remixed material.
The existing unsealed pavement is in porr condition with numerous failures and corrugations. The unsealed surface also createsdust problems for neighbouring dwellings. The road provides access to state forest and carries significant volumes of heavy vehicles during forestry logging activities.Reconstruct the existing formation and provide a gravel overlay with a new bitumen sealed surface.
Existing unserviceable pavement conditions with numerous failures and the unsealed portion of Vernon Place, caused by the lack of drainage. The road provides access to ten properties within an urban environment.Reconstruction of existing formation, the provision of kerb and guttering and a new bitumen sealed surface.
Existing pavement surface is uneven with minor deformations and edge failures. The wearing surface is showing signs of oxidisation coming to the end of useful life.Surface corrections to existing pavement and minor heavy patching of shoulders and new bitumen seal wearing surface.