Sections of this road forms part of a school bus route and various sections of the road were identified being a safety issue due to being badly corrugated with numerous potholes100mm gravel resheeting/patching of 100m in total over 3.81km of unsealed road to improve road trafficability and safety for school buses and motorists
Sections of this road have been identified being a safety risk to motorists due to bad corrugation and numerous potholes100mm gravel resheeting/patching of 300m in total over 15.31km of unsealed road to improve road trafficability and safety for motorists
Sections of this road have been identified being a safety risk to motorists due to bad corrugation and numerous potholes100mm gravel resheeting/patching of 1000m in total over 8.31km of unsealed road to improve road trafficability and safety for motorists
This section of road forms part of a school bus route and various sections of the road were identified being a safety issue due to being badly corrugated with numerous potholes100mm gravel resheeting/patching of 100m in total over 5.3km of unsealed road to improve road trafficability and safety for school buses and motorists
This section of road forms part of a school bus route and various sections were identified being a safety issue due to being badly corrugated with numerous potholes100mm gravel resheeting/patching of 200m in total over 2.8km of unsealed road to improve road trafficability and safety for school buses and motorists
This section of road forms part of a school bus route and various sections were identified being a safety issue due to being badly corrugated with numerous potholes100mm gravel resheeting/patching of 150m in total over 2.4km of unsealed road to improve road trafficability and safety for school buses and motorists
This floodway is inaccessible for long periods. In addition, the floodway invert is too steep and slippery causing issues for motorists and heavy vehiclesConstruction of new floodway (Kungay Mungay Creek) 30m x 6.5m - 450RCP (Reinforced Concrete Pipe)
Water ponds 400mm deep and prevents traffic from crossing the floodwayRemove existing floodway and install 7/2400 x 1200 Slab Link Box Culvert(Length of floodway 20m x 12m wide), reconstruct road - total length 100m)Total cost of proposed project is $300,000
Road surface has deteriorated and is breaking upAshphalt overlay
High wear and tear on the road wearing surface and edges has deemed the road at an unacceptable level of service, this requires the full length of the wearing surface to be replaced.Reseal the full length of Morgans Road, Nook with a new wearing surface of new seal combined with 10mm aggregate.