An approved and qualified contractor has carried out an annual inspection, this inspection identified that the runners, decking, abutments and kerbs were failing requiring urgent replacement of the bridge.Replace current wooden bridge with a concrete bridge.
The headwall and drop structure on this culvert has failed causing considerable erosionIt is proposed to replace the headwall and drop structure with new reinforced concrete components
The existing sub-grade is failing causing the road to deform significantly. The existing culverts are in poor condition and/or have insufficient capacity.Stage 1: Undertake survey, design and purchase of drainage materials to enable stage 2 works: construct the road with sufficient pavement stability and thickness so that it is suitable for heavy vehicle access to the Manjimup industrial estate. Construct to the standard detailed in the Shire policy: Road Hierarchy for a road in an industrial estate. replace culverts and headwalls as required. Place kerbing as detailed in the policy.
The road drainage at this intersection has failed causing water to impact recently constructed residential propertiesIt is proposed to reconstruct and reshape the existing roadside table drains and to place underground drainage to ensure that the properties are not impacted
An approved and qualified contractor has carried out an annual inspection, this inspection identified that the bridges runners, decking and kerbs were failing requiring urgent replacement of the bridge.Replace current wooden bridge with a concrete bridge.
This section of Ridge Street is a narrow seal and is beginning to fail due to increased traffic volumes in this areaIt is proposed to rehabilitate and widen this section of Ridge Street as well as place kerb and channel to facilitate better drainage
The site distance for this intersection has been reduced by the building of a house on the intersection of Ridge and Yelka Street. This road is also currently a gravel road with a steep approach to Ridge streetIt is proposed to realign this intersection both horizontally and vertically place a sealed pavement as well as kerb and channel at its intersection with Ridge Street
The existing seal is stripping and requires a reseal to maintain integrity.Place a 25mm asphalt reseal.
Blocked Drainage and potholes - damaged road impassable during wet season, rendering residents unable to access their properties1. Site Establishment and disestablishment; implementation of workplace and health safety act; detailed design and traffic control,
2. Preparation of Road base;
3. Spray Seal and
4.Clean up site
Existing sealed pavement has failed due to the road being a heavy haulage route with an increase in road train use in mainly carting grain to the Cooperative Bulk handling facility in MooraThe proposed work is to cement stabilise the existing pavement and to widen the seal from 6.2 to 7.0 metres with 1.5 metre wide gravel shoulders