The entire road requires re-sheeting with gravel as there is no gravel left for grading purposes. This has created safety issues for vehicles to drive safely because of the corrugations and especially on corners.Grading works to remove corrugations and road crown shaping to re-sheet with gravel which includes stormwater improvements and new signage and guide posts.
High wear and tear on the road wearing surface and edges has deemed the road at an unacceptable level of service, this requires the full length of the wearing surface to be replaced.Reseal the full length of Winifred Avenue, Acacia Hills with a new wearing surface of new seal combined with 10mm aggregate.
Road pavement deteriorated beyond its useful life.Reconstruction of existing unsealed road to achieve a minimum of 150mm compacted road surface. Works include the rehabilitation of existing material and the importing of additional material.
Road surface has deteriorated requiring constant maintenance and causing safety concernsPlane and reinstate failed pavement areas and apply an asphalt overlay the full width of the road. Reinstall concrete medians and line mark as required
High wear and tear on the road wearing surface and edges has deemed the road at an unacceptable level of service, this requires the full length of the wearing surface to be replaced.Reseal 2,365 metres of Lower Beulah Road, Lower Beulah with a new wearing surface of new seal combined with 10mm aggregate.
High wear and tear on the road wearing surface and edges has deemed the road at an unacceptable level of service, this requires the full length of the wearing surface to be replaced.Reseal 700 metres of Wellington Road, Gowrie Park with a new wearing surface of new seal combined with 10mm aggregate.
Existing spray seal had reached the end of it's serviceable life and was brittle causing it to breakaway forming potholesPlane and reinstate degraded areas and apply a new spray seal surface. Line mark as appropriate
High wear and tear on the road wearing surface and edges has deemed the road at an unacceptable level of service, this requires the full length of the wearing surface to be replaced.Reseal 210 metres of Albert Street, Sheffield with a new wearing surface of new seal combined with 7mm aggregate.
Road is currently unsealed, it scours very badly after every rain event. The road is steep and vehicle numbers are rising each year due to the subdividing of unproductive large diary farms.Browns Road, Dunmore - From: the intersection with Swamp Road to Chainage 728 metres at gate. Scavel existing surface to a depth of 100mm and add road base to the existing unsealed road material. Prepare and lay a new spray seal surface to make this segment of road an "all weather" road.
High wear and tear on the road wearing surface and edges has deemed the road at an unacceptable level of service, this requires the full length of the wearing surface to be replaced.Reseal 432 metres of Lamberts Road, Merseylea with a new wearing surface of new seal combined with 10mm aggregate.