Current shoulders and seal in a poor state due to heavy traffic from contractors and heavy machinery from industrial blocks.Reseal works will include grade, water and roll shoulders and 2 coat reseal 6 metres wide.
Insufficient pavement depth, deep corrugation and pot holes and large soft areas of the road.Reconstruct/Re-sheet existing pavement. Clear vegetation from drainage slopes. Install guide posts and signage.Total cost of proposed project is $134,157
Natural floodway is obstructed by the road. Drainage culverts collapsed. Big trees overhang the road.Reduce the level of the road to create a floodway. Reconstruct pavement and bitumen seal the new floodway. Removal of tree branches and trees.
Insufficient pavement depth, deep corrugation soft areas and pot holes. Vegetation overgrown.Reconstruct/Re-sheet existing pavement. Remove vegetation. Clear drainage slopes. Install guide posts and signs.Total cost of proposed project is $63,088
Bridge abutment area has depleted rock beaching.Stabilise bridge abutments by supplying and placing rock beaching on batters only, 2.5m upstream and downstream. Extend 2m beyond each end of bridge on both sides.
Bridge abutment area has depleted rock beaching. Steel components showing signs of rust.Stabilise bridge abutments by supplying and placing rock beaching on batters only, 2.5m upstream and downstream, including extra beaching where undermining has occurred at southeast wing wall. Remove rust and paint all steel components of the bridge.
Bridge abutment area has depleted rock beaching. Steel components showing signs of rust. Several expansion joints need replacement.Stabilise bridge abutments by supplying and placing rock beaching on batters only, 2.5m upstream and downstream. Remove rust and paint bearers of the bridge. Reinstate expansion joints that have failed in bridge deck. Reinstate lost fill and correct drainage at south approach along guard rail.Total cost of proposed project is $101,530
Batters have eroded and bridge abutment area has depleted rock beaching.Reshape eroded batters and stabilise bridge abutments by supplying and placing rock beaching on batters only, 2.5m upstream and downstream. Repair cracking of concrete rails and repaint all rails.
Bridge abutment area has depleted rock beaching. Steel components showing signs of rust. Deck planks need replacing and bolts and screws need to be tightened.Stabilise bridge abutments by supplying and placing rock beaching on batters only, 2.5m upstream and downstream. Remove rust and paint all steel components of the bridge. Replace deteriorated deck planking. Tighten all bolts and screws. Supply & install guard rail along bridge and extend 2m beyond each end of bridge on both sides.
Combined timber and steel framed structure is nearing the end of its serviceable lifeReplacing the existing structure with a new structure.