The existing road pavement seal has exceeded its functional life, as evidenced by increasing levels of potholes, surface defects, cracking and edge frettingRepair of potholes and surface defects and application of spray seal
The existing road pavement seal has exceeded its functional life, as evidenced by increasing levels of potholes, surface defects, cracking and edge frettingRepair of potholes and surface defects and application of spray seal
The existing road pavement seal has exceeded its functional life, as evidenced by increasing levels of potholes, surface defects, cracking and edge frettingReconstruct part of existing road pavement, repair of road edge, shoulder, potholes and surface defects, crack sealing, application of spray seal and pavement marking
The existing road pavement seal has exceeded its functional life, as evidenced by increasing levels of potholes, surface defects, cracking and edge frettingRepair of road edge, shoulder, potholes and surface defects, crack sealing and application of spray seal
Interaction between Road users.
Cyclists and Gophers ride along Knight Terrace between the parallel parked cars and the designated road. This represents a considerable safety issue between vehicles and cyclists/gophers along Knight Terrace and Stella Rowley Drive resulting in several near collisions.The work proposed is to upgrade the existing footpath to a 3 metre wide concrete dual cycle way thus encouraging cyclists and gopher riders to utilise the cycle way instead of traversing along Knight Terrace and Stella Rowley Drive.Total cost of proposed project is $219,539
This section of road is currently gravel.Brick pave the area outlined above
Fatigue failure of road pavement in the form of longitudinal cracksResurfacing the road pavement with average 30 mm of dense graded asphalt. Total length- 125 metres, Average width including parking bays-9.5 metres , Area- 1190m2Total cost of proposed project is $58,000
Fatigue failure of road pavement due to ageing of the wearing surface.Resurfacing with average 30 mm of Dense Graded Asphalt. total length- 210 metres, Average width- 6.0 metres, Area- 1260m2Total cost of proposed project is $66,500
Fatigue failure of road pavement wearing surface exhibiting in the form of moderate longitudinal cracking.Resurfacing the road pavement with average 25 mm of dense graded asphalt, Length of road pavement-120.0metres, average width-4.0 metres , Area of road pavement- 480m2Total cost of proposed project is $23,000
The existing seal is failing and requires a reseal to maintain integrity.Place a 25mm thick asphalt reseal to the laneway