Condition of the deck has deteriorated to a point where the carrying load limit has been reduced from standard.Bridge No 117. It is proposed to upgrade the bridge decking with a new concrete decking to restore its carrying capacity to standard.
The condition of the bridge has deteriorated to the end of its useful life and currently has load limits.Bridge No 134. It is proposed to construct a new reinforced concrete structure that will restore the service to standard.
The condition of the deck has deteriorated to a point where the carrying load limit has been reduced from standard.Bridge No 74. It is proposed to upgrade the bridge decking with an overlay of reinforced concrete to restore it carrying capacity to standard.Total cost of proposed project is $235,570
The condition of the bridge has deteriorated to the end of its useful life and has load limits.Bridge No 6. It is proposed to construct a new reinforced concrete structure that will restore the service to standard.
Surface deterioration of existing pavement and upgrade to allow all weather access.Pave and seal.
Lack of gravel, surface rutting, poor shape and inadequate drainage.It is proposed to rectify the problems with this section of road by installing additional mitre drains and cleaning the existing drains. The road will then be tyned and re-shaped. Following this new gravel will be imported, spread and compacted. The road will then be trimmed to its final shape.
Road Pavement has deteriorated and is not wide enough to safely accommodate for heavy vehicle movements.Widen road pavement and shoulders, including 400 metre sectional realignment of road. Correct pavement cross-fall and longitudinal gradients and rehabilitate the remaining 2.2km of road pavement. Improve drainage, signage, bitumen seal and provide new line marking.Total cost of proposed project is $1,500,000
Road pavement is distressed with cracks, potholes and patches due to increased traffic condition.Repair the pavement and resurface with asphaltic concrete.
Narrow bitumen surface and damaged shoulders.Strengthen and seal shoulders to create a 6.5m wide bitumen surface.
Deformed pavement, cracked and poor shape.Lime stabilising and resealing of damaged pavement.