Seal has worn away through to the pavement. Profile existing surface and reseal with asphalt.
Deteriorated road surface requires renewal. Intersection requires widening to accommodate increased traffic movements.Rehabilitate pavement. Widen formation to include turning lane into Sports complex and include safe pedestrian access with footpaths and refuges for road crossing.
Road condition assessments on this stretch of road have determined that the current condition of the road - including cracking, potholes and shoving - requires renewal to return the asset to a serviceable condition. Pavement stabilisation and sealing including replacing 2 culverts on this segment of the road. Additional funding source - Bass Coast Shire Council
The road surface has multiple cracks and road surface is deteriorating fixing it now will help stop it from getting worse, need to replace deteriorating kerbs and pits to enhance safety and provide proper drainage. Replacing deteriorated kerbs to restore proper drainage function and edge support, and Spray sealing the road to prevent water ingress and future pavement failures. Additional funding source - Bass Coast Shire Council
Minimal gravel surface. Gravel resheet majority of worn areas.
The seal addresses surface aging, patching, texture loss, and water ingress—protecting the pavement and improving durability.Apply a 10mm S45R final seal to the pavement surface.
The seal addresses surface aging, patching, texture loss, and water ingress—protecting the pavement and improving durability.Apply a 10 mm S45R final seal to the pavement surface.
The seal addresses surface aging, patching, texture loss, and water ingress—protecting the pavement and improving durability.Apply a 10mm S45R final seal to the pavement surface.
The seal addresses surface aging, patching, texture loss, and water ingress—protecting the pavement and improving durability.Apply a 10mm S45R final seal to the pavement surface.
Existing gravel road is rough and dusty and requires 3-4 grades a year to maintain.
This road is a major link from Uralla / Armidale to Copeton Dam.Minor realignment, improve superelevation on corners and then base gravelling and bitumen sealing.