Gravel surface of the road has eroded away. Reform and gravel sheet road surface.
The condition of the road pavement has been deteriorated with the evidence of crocodile cracks and rutting. The road pavement requires repair and
resurfacing. Some sections of the kerb and gutter also have been damaged, which requires reconstruction. The project includes repair and resurfacing of the road pavement and reconstruction of damaged section of kerb and gutter. The estimated cost of the project is$705,000 and it will be jointly funded by Council Funds ($545,000) and RTR Funds ($160,000).
The condition of the road pavement is deteriorated with the evidence of fatigue cracks, rutting and ravelling and some sections of kerb and gautter also have damaged. The road requires repair and resurfacing and the damaged segments of kerba and gutter needs reconstruction to maintain the serviceability of
the road. The project includes repair and resurfacing of the pavement and reconstruction of the damaged sections of kerb and gutter and other associated civil works. The estimated cost of the project is $166,000 and it will be fully funded by RTR Funds.
Block cracking and potholes.Asphalt intersection.Total cost of proposed project is $39,017
The road seal has reached the end of its service life and exhibits signs of pavement distress. The road camber has deteriorated, resulting in water ponding at several locations. Kerbs on both sides are damaged, affecting the effective flow of stormwater along the gutters.Rehabilitate the road pavement to enhance structural integrity and surface profile. Apply a new asphalt seal and replace kerbs on both sides with new ones. Upgrade drainage infrastructure by installing additional pits and connecting them to the existing stormwater pipeline. The additional funding of $160,600 will be sourced from Council own funds.Total cost of proposed project is $741,100
The road seal has reached the end of its service life and exhibits signs of pavement distress. The road camber has deteriorated, resulting in water ponding at several locations. Kerbs on both sides are damaged, affecting the effective flow of stormwater along the gutters.Rehabilitate the road pavement to enhance structural integrity and surface profile. Apply a new asphalt seal and replace kerbs on both sides with new ones. Upgrade drainage infrastructure by installing additional pits and connecting them to the existing stormwater pipeline. the additional funding of $123,890 will be sourced out from council own funds.Total cost of proposed project is $473,890
Small sealed section of road starting to detiorate showing signs of stone loss and some minor patching works.10 mm Re-seal works.
Pavement at end of life with extensive failures along whole section.Full rehabilitation is required, this consists of digging out and replacing the pavement failures and applying ashphalt surface.Total cost of proposed project is $114,404
Poor road shape and small width.Form into shape, widen and gravel resheet to 150 mm.
Poor formation and loss of gravel surface.Form, shape and gravel resheet to 150 mm.