Road is rutted and surface needs to be resealed to prevent further water ingress into the pavement. Off road drainage needs to be improved.Road is to be resealed with kerbing being provided with improvements being made to off road drainage.Total cost of proposed project is $102,432
Road is rutted and surface needs to be resealed to prevent further water ingress into the pavement. Off road drainage also needs to be improved.Road is to be resealed with kerbing being provided with additional improvements being made to the off road drainage.
Surface deterioration due to stripping, loss of stones and bleeding.polymer modified binder reseal
Road surface is rutted and surface needs to be resealed to prevent further water ingress into the pavement. Off road drainage needs to be improved.Road is to be re-sealed with kerbing being provided along with additional improvements to off road drainage.Total cost of proposed project is $57,427
Road is severely potholed and has suffered significant edge break narrowing pavement.Reconstruct this section of pavement to 7.2m in width to improve safety and make the road more trafficable.
Surface deterioration due to stripping, loss of stones and bleedingPolymer modified binder reseal
Road is severely potholed due to water ingress with problems in the off road drainage. It is also a heavy vehicle route.Reconstruct road to prevent water ingress and improve drainage. A low point in the road will be constructed as a floodway with a cement stabilised base course.
Surface deterioration due to stripping. loss of stones and bleedingPolymer modified binder reseal
Gravel road in poor condition, poor alignment and shape. Road requires greater than average grader maintenance compared to other unsealed roads within the LGAReconstruct and seal the first 1.5km of unsealed road.Total cost of proposed project is $1,121,150
The road has become deteriorated due to wear and tear. It is very rough to drive on and requires a reduction in speed for safety purposes.Medium Formation Grade