Existing bitumen seal on the pavement is aged and/or crackingWork will be carried out to resurface the pavement with a new layer of bitumen and wearing aggregate (stone) (Length 3270m x Width 6m)
Existing bitumen seal on the pavement is aged and/or crackingWork will be carried out to resurface the pavement with a new layer of bitumen and wearing aggregate (stone) (Length 3270m x Width 6m)
Existing bitumen seal on the pavement is aged and/or crackingWork will be carried out to resurface the pavement with a new layer of bitumen and wearing aggregate (stone) (Length 1745m x Width 4m)
This section of road is a narrow seal (single lane) and the gravel shoulders are failing resulting in potholes and making it unsafe to travel at the designated limit.Construct shoulders and seal to achieve a total 6.2m wide sealed pavement with 0.6m shoulders.
Existing bitumen seal on the pavement is aged and/or crackingWork will be carried out to resurface the pavement with a new layer of bitumen and wearing aggregate (stone) (Length 1020m x Width 6.4m)
Failure of road pavement resulting in rough sections and potholes.Rip up existing seal and pavement. Reconstruct pavement and seal to a width of 6.2m wide with 0.6m shoulders.
Existing bitumen seal on the pavement is aged and/or crackingWork will be carried out to resurface the pavement with a new layer of bitumen and wearing aggregate (stone) (Length 255m x Width 13.2m)
Failure of road pavement resulting in a rough section.Rip up existing seal and pavement. Reconstruct to the same seal width between kerb and channels.Total cost of proposed project is $212,314
Failure of road pavement resulting in a rough section.Rip up existing seal and pavement. Reconstruct pavement and seal to a width of 6.2m wide with 0.6m shoulders.
The kerb and channel is old and not functioning properly causing storm water build up.Replacement of a 154m section of kerb and channel. This section has been identified as requiring renewal based on condition and prioritised based on condition assessments.