Gravel road in an urban/built up area. Level of service for area and traffic no longer adequateConstruct and seal to 6.2m width with open table drains
The kerb and channel is old and not functioning properly causing storm water build up.Replacement of a 154m section of kerb and channel. This section has been identified as requiring renewal based on condition and prioritised based on condition assessments.
Gravel road in an urban/built up area. The road is a link road for heavy vehicles which causes dust issues with residents. The alignment is poor in conjunction with the gravel surface is a safety concern.Construct and seal to 6.2m width with open table drains
Surface deterioration due to stripping, loss of stones and bleeding.Polymer modified binder reseal
The section of Heily Street is a narrow sealed urban street of 8.7m with unsealed shoulders. Recent traffic counts have highlighted increased traffic movements, Council has also received complaints from the community about the lack of on street parking in the vicinity of the Rushworth Primary to Year 12 School.Widening of street for 130m opposite Rushworth Primary to Year 12 School and the Rushworth Cemetery. Seal to be widened by 6.5m from the existing edge of the sealed pavement.
Pave and seal to eliminate loose gravel and bulldust sections.Pave and SealTotal cost of proposed project is $1,911,438
Cracks and potholes on pavement. The surface life has expired and needs to be resurfaced to extend the life of underlying road pavementRoad pavement will be resurfaced by using Asphalt Surfacing
Failed pavement as well as extensive cracking and drainage issues.Rehabilitation and reconstruction of pavement
Remove pothole and rutting on the unsealed road surface.Road base top up on the road surface repair damaged shoulders and rolling to compact and consolidate material to provide a safe travelling environment.
Pothole and rutting caused from normal road useRoad base top up on the surface, repair damaged shoulders and rolling to compact and consolidate material. Works required in order to maintain and maximise service life of the road network and provide a safe travelling environment.