Cracks on pavement.
Pavement due for resealing.Crack sealing prior to resealing.
Resealing.
Cracks on pavement.
Pavement due for resealingCrack sealing prior to resealing.
Resealing
Extensive pavement failures within the area, and requires constant maintenance worksPulverise, stabilise, shape, relay and compact existing pavement/subgrade. Apply 100mm thick layer of fine crushed rock. Apply two coat spray seal. Clean and reshape existing drain
Cracks on pavement.
Pavement due for resealing.Crack sealing prior to resealing.
Resealing
Council bridge inspections identified a reduced deck capacity and damaged bridge barrier.Construction of a new wider concrete deck overlay and installation of new compliant bridge barrier.Total cost of proposed project is $111,222
The existing town road stormwater system cannot handle 1 in 1 year flows, causing the roads to flood and properties to be inundated with water.Remove existing pipework from within Laneway 229 and drainage pits on Abel St including pipe crossing Abel Street and replace with an increased diameter pipe and new pits that can handle the water flows.
Deterioration of asset through standard road usageApplication of a 7mm reseal to existing sealed pavement, for a distance 2.87 kilometres with an average width of 5.5 metres
The existing town road stormwater system cannot handle 1 in 1 year flows, causing Connolly Street to flood.Replace existing 525mm diameter pipework with a 1050 diameter pipe
Deterioration of asset through standard road usageThe application of a 7mm reseal to existing sealed road, which is 4.6 kilometres long with an with an average pavement width of 5 metres
Deterioration of asset through standard road usageThe application of a 7mm reseal to existing sealed pavement. which is 2.1 kilometres in length With an average pavement width of 5.7 metres